- Agreement
- Available Information
- Bid Form
- Cover Page
- Environmental Protection
- Erosion and Sedimentation Control
- General Conditions
- General Electrical Provisions
- General Requirements
- Instructions to Bidders
- Invitation to Bid
- Pipe Bursting
- Safety Requirements
- Scope of Bid
- Supplemental General Conditions
- Temporary Construction Facilities
Engineering
The Engineering Team is a team of professional staff that is dedicated to the assessment, design, construction and implementation of system upgrades as well as new development of the City of Lloydminster’s water, sanitary sewer, storm sewer, transportation and drainage channel infrastructure. Our team of dedicated personnel work closely with other City of Lloydminster departments to review, assess and implement capital infrastructure programs to improve our systems capacity, resilience, safety, resident mobility, as well as forecast for future expansion and development within and adjacent to the City of Lloydminster. The programs completed by the Engineering Team range from traffic flow assessments and municipal infrastructure upgrades, to storm channel improvements.
The Engineering Team maintains and regularly updates the City of Lloydminster Master Plans and Documents. The Master Plans form the baseline from which system upgrades and improvements are derived as well as provides a road map for future development and expansion of the City of Lloydminster to ensure all neighbourhoods within the City of Lloydminster receive the same level of service regardless of location.
Master Technical Specifications
- Asbestos Cement Pipe
- Asphalt Prime and Tack Coats
- Building Services
- Cement Stabilized Subgrade Construction
- Chain Link Fence and Gates
- Clearing and Grubbing
- Culverts
- Concrete Walks, Curbs and Gutters
- Excavation, Trenching and Backfilling
- Full Depth Reclamation Using Foamed Asphalt
- Geosynthetics
- Granular Base
- Horizontal Directional Drilling
- Hot Mix Asphalt Pavement
- Miscellaneous Removals and Adjustments
- Pavement Markings
- Pavement Milling and Removals
- Portland Cement Concrete Payment
- Precast Concrete Box Sewers
- Riprap
- Roadway Excavation Embankment and Compaction
- Rolled Erosion Control Products
- Sewer Mains
- Subgrade Construction
- Topsoil, Seeding and Sodding
- Tree, Shrubs and Groundcover
- Watermains
- Wire Fences and Gates
- Wood Fence
Municipal Development Standards
The City of Lloydminster Municipal Development Standards has been prepared to guide designers and the development industry in the design of municipal improvements, systems, and lots that will meet the requirements of the City of Lloydminster. These standards will be reviewed on an annual basis, with updates provided as required; persons in receipt of and using the Municipal Development Standards are required to ensure they have the latest revisions.
- Lloydminster Digital Submission Standards
- Request for Changes to Publications Form
- Fillable Forms
- Standard Drawings
- Section 0 - Change Log
- Section 1 - Introduction to Standards
- Section 2 - Procedures for Development
- Section 3 - Roadway Systems
- Section 4 - Sanitary Sewer Systems
- Section 5 - Storm Drainage Systems
- Section 6 - Water Distribution Systems
- Section 7 - Franchised Utilities
- Section 8 - Landscaping and Fencing
- Section 9 - Testing Procedures
- Section 10 - Abandoning Existing Infrastructure
- Section 11 - Single Lots (Development Permits)
Below are the 2021 Revision Memorandum and revised forms. These documents are deemed to be in effect and form part of the Municipal Development Standards as of January 01, 2022.
North and South Corridor Project
The North-South Corridor Project consists of converting 50 Avenue to a one-way southbound and 49 Avenue to a one-way northbound transitioning at 42 Street and 57 Street, respectively. Underground work and extensive surface road work must be completed to finish the multi-year North-South Corridor Project.
Phase 1A was accepted as a Capital Budgeted Project in 2014 and included the following:
- Water line upgrade on 50 Avenue from 35 Street to 36 Street
- Water line relocation on 49 Avenue and 42 Street
- Installation of storm trunk main on 49 Avenue from 39 Street to 43 Street
- Water line upgrade on 50 Ave from 57 Street to 60 Street
Phase 1B was approved, subjected to Capital Budget financing in 2016, includes:
- Complete reconstruction of 50 Avenue between 35 Street and 44 Street and between 57 Street and 60 Street
- Construction of the transition couplets on 49 Avenue between 40 Street and 44 Street and 57 Street and 60 Street
- Street signage and traffic lights on 49 Avenue and 50 Avenue will also be adjusted between 35 Street and 62 Street
- Landscaping around transition areas
The following are two videos featuring three-dimensional artist renderings of the proposed concept for the North-South Corridor Project. Please note, all aspects of the renderings are subject to change. The videos are intended to provide a general overview of the potential southbound and northbound one-ways featured in the proposed corridor.
Other related Documents
Contact Us
City of Lloydminster
4420 50 Avenue, Lloydminster
AB/SK, T9V 0W2
Phone: 780-875-6184
Fax: 780-871-8345
Email: info@lloydminster.ca